The tiled floor...
Showing posts with label tile. Show all posts
Showing posts with label tile. Show all posts
Thursday, September 27, 2007
Kitchen Remodel: Floor tile is now in....
Today the tile man put in the floor tile grout. Tomorrow they start installing the cabinets. Monday the Corian guy comes to make a template for the counter top fabrication. We're getting there...slowly...but we're getting there.
Tuesday, September 25, 2007
Kitchen Remodel: Tile Progress
The tile man continues his progress. The floor has now been leveled and he is laying tiles...



You can see the portion of "cement" he last put down in the lower left hand corner...
Tiling commences (note we started painting the walls)...
The tile guy is kind of neat, he seems to take his time to be accurate...
...which we like...
...which we like...
Friday, September 21, 2007
Kitchen Remodel: The Tileman Cometh
The the drywall guy finished two days ago (Paul still needs to prime and paint the walls). Yesterday the tileman came, put in screws to remove floorboard squeaks, laid a steel mesh, and today started leveling the floor. If you look at the picture below, he's putting on a about 1/2 inch to level off all irregularities in our floor (he's almost finished). After the tileman is finished the cabinets get installed. Woo-hoo!
Imagine tile, cabinets, countertops, etc here...
Subscribe to:
Posts (Atom)